Dec 21, 2023 | Uncategorized
Malaysian Refining Company Sdn Bhd (MRCSB), one of the subsidiaries of PETRONAS, has engaged IFP Engineering to perform a Basic Engineering Design project, with emphasis on High Sulphur Fuel Oil (HSFO) elimination from a Delayed Coker Unit (DCU). This project was done...
Dec 14, 2023 | Uncategorized
As part of the EPCC of Condensate & Gas Mercury Removal Unit (MRU) Package for Pegaga ICPP project, IFP Engineering had been assigned to perform a Mercury Partitioning Study. The objective of the study is to generate Mercury concentration in key process streams...
Dec 12, 2023 | Uncategorized
In collaboration with Chiyoda Malaysia, we provided engineering design services for the Volkswagen Longlife III Project at BP’s PKI Lubricants Blending Plant, which is also known as AsPac Lubricants (Malaysia). The engineering design was undertaken for various...
Dec 12, 2023 | Uncategorized
PS Terminal is an oil storage terminal jointly-shared by Shell and PETRONAS located in Bintulu, Sarawak. In 2017, Shell was planning to upgrade the loading capacity of its Bitumen Storage and Transfer Facility at the PS Terminal, from 60 m3/hr to 120 m3/hr. IFP...
Dec 12, 2023 | Uncategorized
Kemaman Bitumen Company (KBC) has assigned IFP Engineering to analyze the pipe stress of the Bitumen Line at TK-501 BN and TK-510 G. A Pipe Stress Analysis was conducted using CAESAR II software in order to assess the structural integrity and reliability of the piping...